The 130-megawatt Bitter Ridge Wind Farm, built in Jay County, Indiana, has been recently completed. The said wind system is spearheaded by Scout Clean Energy, a Colorado-based developer, operator, and owner of renewable energy systems. The tax equity funding for the wind farm is also closed.
The development began in 2016, and the establishment of the necessary infrastructure started in August 2019. The wind turbines used could generate 2.82 megawatts each.
The 15-year PPA had been dealt with Constellation, an Exelon company, to purchase 80 percent of the generated output.
Mortenson Construction, responsible for the on-…
